LED Reflector lamp
R50 led lamp 5W
ItemNo.: LD-R50SA05-B
R50 led lamp
Low price, quantity production, short lead time
Payment terms: 30% TT advance, the balance before shipment or LC at sight
Base Type | E14 |
Watt | 5W |
Voltage | AC85-265V |
Luminous Flux | 400lm |
Color | Warm white, Cool white, Day light |
Product size | 50x87mm |
Beam Angle | 120 degree |
Material | Aluminum lamp body + Glass/PC shape |
Certificate | CE, ROHS |
CRI(Ra) | >80 |
Payment terms: 30% TT advance, the balance before shipment or LC at sight
Specification
Shipping&Payment
Contact Us
3 years Warranty for E14 R50 led lamp.
EFlite brand or OEM brand
Specification of R63 R50 led lamp as below:
Item
Watt.
Luminous Flux
Base
Size
Material
Color temp.
R63 led lamp 10W 800lm E27 Ø63x100mm Aluminum+Glass/PC cover 2500K-7000K R63 led lamp
8W
600lm
E27
Ø63x100mm
Aluminum+Glass/PC cover
2500K-7000K
R63 led lamp
7W
520lm
E27
Ø63x100mm
Aluminum+Glass/PC cover
2500K-7000K
R63 led lamp
5W
400lm
E27
Ø63x100mm
Aluminum+Glass/PC cover
2500K-7000K
R50 led lamp 4W 300lm E14 Ø50x87mm Aluminum+Glass/PC cover 2500K-7000K R50 led lamp 4.5W 350lm E14 Ø50x87mm Aluminum+Glass/PC cover 2500K-7000K R50 led lamp 5W 400lm E14 Ø50x87mm Aluminum+Glass/PC cover 2500K-7000K
Advantage:
+ Always keep high cost-effective
+ No Mercury
+ High lumen and low power
+ Long lifetime
+ Ra≥80
+ Instant start, no flashing
+ Environment friendly and 80% power saving
+ Protection of your sales area, ideas of design and all your private information
Application:
Widely used in the hotel, meeting room, offices, hospital, schools, factories, commercial lighting, shopping malls, supermarkets, kitchen, home indoor lighting and so on.
Cautions:
1, Switch off the power before replacing the lamp.
2, Keep away from direct sunshine and high temperature.
3, Indoor use only.
4, If any doubt about the installation or use of this product, consult a competent electrician.
R50 led bulb, R50 led lamp, R50 led lighting, R50 reflector led bulb, R50 reflector led, reflector R50 led bulbs, reflector led lamps R50,
R50 spotlight, R50 spot led, R50 ceramic, E14 R50 led bulbs, R50 E14 led lamps, SMD R50 lamp, led reflector lamp, led bulb reflector, reflector led lighting
Shipping:
There are two key factors which will affect the time you receive your items.
1. Item processing time
After the receiving of your order, we need some days to prepare the raw materials and also need time to test the product in order to ensure its quality. There are different kinds of processing time for different items. Average processing time is 15 working days; however, it varies from the materials' stock status. As for the small quantity, the processing time is one wee while as for the large quantity, it will be about 30 days.
2. Shipping methods
A: By sea shipment
Normally one month
B: By air shipment
Normally 3-5 days
C: By express mail
Payment:
1. L/C
The payment for big amount.
2. T/T
Please do email us your order number, the amount you pay, the exact date you do the wire transfer after you pay for it
3. Western union
Please contact us at: info@nbefine.com for details.
Note: Please email us the following information after you pay the Western Union
1) The 10 digit control number.
2) Sender's name.
3) The exact amount you send.
4) Sender's address.
5) Your shipping address.
E-fine Industrial Co.,Limited
Address: No. 1 Building, Wante Business Centre,
487 Yangmuqi Road, Hi-Tech Zone,
Ningbo, Zhejiang, China
Zip: 315000
Tel: 86-574-86669455
Fax: 86-574-87619090
Contact: Ms. sharon
E-mail: info@nbefine.com
Website: www.nbefine.com
http://nbefine.en.alibaba.com
Skype: nbsharon
WhatsApp: + 86 (0) 135 6630 3011
QQ: 63068735
Related products
-
LD-R63EC06
-
LD-R50SC05
-
LD-R39SC03
-
LD-R50SA05
-
LD-R63EA07
-
LD-R63EA05-B
-
LD-R63EA07-B
-
LD-R63EA08-B
-
LD-R63EA10-B
-
LD-R50SA04-B
-
LD-R50SA045-B
-
LD-R63EA08